GeotechnIcal Projects

Engıneerıng desıgn Coordınator at Tumas Indıa PVT. LTD.

- Coordination between office design team and site PMC staff

- Theoretical and practical assistance to the design team staff.

- Monthly design reports, which is prepared for the Headquarters.

Geotechnıcal desıgner at Proyapı Engıneerıng and consultancy

Taken part in the projects of the governmental Directorates in Turkey, such as TCDD, KGM and İBB, the projects

of directorates from other countries, such as ADH, The duties on these projects are:

- Preparing the geotechnical reports of the projects.

- Suggesting the appropriate design of ground improvements, if needed.

- Conducting theconfirmation of the design and reports to the related directorates.

The projects, which are taken part in:

- Yavuz Sultan Selim Bridge - Halkalı Railway Project (Turkey)

- Konya - Seydişehir Railway Project (Turkey)

- Baladjari - Astara Railway Project (Azerbaijan)

In addition to the technical works, the planning of the construction sequence of the designed project is also taken into consideration.

geotechnıcal engıneer at TUMAS TUrk EngIneerIng and Consultancy 

In addition to the governmental offices' design works, geotechnical designs of the works of private companies.

Some of the work handled in this company:

- Ankara Stadium Geotechnical report

- Elazıg Stadium Geotechnical report

- Erzincan Stadium Geotechnical report

- Geotechnical reports of the sports centers will be constructed in different states such as Mus, Bayburt, Isparta,

Erzincan, Eskisehir, Amasya, Mersin, Konya

- TOKI Hemsin Housing Estate Project

- TOKI Macka Housing Estate Project

- The consultancy of the Başkentray Project

geotechnıcal engıneer at Su-yapı EngIneerıng and Consultancy

- Yenice – Ulukisla Railway Project / Designing and preparing geotechnical reports of the Infrastructures.

- Sur – Bidbid Highway Tunnels / Designing and preparing geotechnical reports of the tunnels

- Kabataş – Üsküdar Pedestrian Tunnel Project / Designing and preparing the geotechnical reports of the tunnel